Foamed Ceramic Exterior Wall Panel Installation Guide


Click/Tap here to get to know about the panel.


1.Tools and Materials

últimas notícias da empresa sobre Foamed Ceramic Exterior Wall Panel Installation Guide  0

últimas notícias da empresa sobre Foamed Ceramic Exterior Wall Panel Installation Guide  1


últimas notícias da empresa sobre Foamed Ceramic Exterior Wall Panel Installation Guide  2
(1)Foamed Ceramic Panel

(2)Anchoring parts
provide mechanical fixation for foamed ceramic boards

(3)primer/sealer
enhances bonding between the base wall and mortar(for ceramic tile walls only)
últimas notícias da empresa sobre Foamed Ceramic Exterior Wall Panel Installation Guide  3 últimas notícias da empresa sobre Foamed Ceramic Exterior Wall Panel Installation Guide  4 últimas notícias da empresa sobre Foamed Ceramic Exterior Wall Panel Installation Guide  5
(4)Cement Mortar
provide bonding between foamed ceramic boards and base wall
(5)Electric drill and drill bits
Used to drill in screws for anchoring parts
(6)Foam Strips
for joint filling between foamed ceramic panels
últimas notícias da empresa sobre Foamed Ceramic Exterior Wall Panel Installation Guide  6 últimas notícias da empresa sobre Foamed Ceramic Exterior Wall Panel Installation Guide  7
(7)Sealant
for joint filling between foamed ceramic panels 
(8)Masking Paper
protects board edges and surfaces during installation

⚠️ Tip: All core materials—anchoring parts, foam strips, sealant, mortar and others—can be supplied as a complete kit by our company, simplifying your installation process.

2. Installation Process


  (1)Installation on New Walls

últimas notícias da empresa sobre Foamed Ceramic Exterior Wall Panel Installation Guide  8 → últimas notícias da empresa sobre Foamed Ceramic Exterior Wall Panel Installation Guide  9 → últimas notícias da empresa sobre Foamed Ceramic Exterior Wall Panel Installation Guide  10
Step1:Drill the anchoring parts
(1)Mark the drilling positions on the wall according to board size
(2)Drill into the wall to install our supplied anchoring parts

Step2:Apply mortar
(1)Spread our cement mortar evenly on the wall surface and the back of the board
(2)Ensure proper thickness for full adhesion

Step3:Insert boards into anchoring parts and attach to wall
(1)Place the board into the pre-installed anchoring parts
(2)Check that the board is level and flush
 
 
↓
últimas notícias da empresa sobre Foamed Ceramic Exterior Wall Panel Installation Guide  11 ← últimas notícias da empresa sobre Foamed Ceramic Exterior Wall Panel Installation Guide  12 ← últimas notícias da empresa sobre Foamed Ceramic Exterior Wall Panel Installation Guide  13
Step6:Fill joints with foam strips
(1)Insert our foam strips into the gaps between boards
(2)Apply masking paper along the edges to prevent mortar or sealant contamination

Step5:Repeat steps 2–4
Continue with the next boards, maintaining vertical alignment and flatness

Step4:Install top anchoring parts
Drill and secure the top part of the board for stability
↓
 
 
últimas notícias da empresa sobre Foamed Ceramic Exterior Wall Panel Installation Guide  14 → últimas notícias da empresa sobre Foamed Ceramic Exterior Wall Panel Installation Guide  15

Step7:Apply sealant
(1)Fill the joints with our high-quality sealant 
(2)Ensure joints are sealed and watertight 

Step7:Apply sealant
(1)Fill the joints with our high-quality sealant 
(2)Ensure joints are sealed and watertight 


(2)Installation on Tiled Walls

  • Check tile adhesion:
    • Loose tiles → Remove tiles and build a new cement wall
    • Stable tiles → Apply a primer/sealer
  • Follow the new wall installation process

  (3)Installation on Coated Walls

  • Build a new cement wall first
  • Follow the new wall installation process with our complete set of materials

3. Tips for a Successful Installation

  • Ensure each board is level and vertical before fixing
  • Clean excess mortar and sealant immediately during installation
  • Foam strips should match joint sizes for effective sealing
  • Avoid over-applying sealant to maintain a neat finish
  • Using our supplied kit (anchoring parts, mortar, foam strips, sealant and others) simplifies installation and ensures high-quality results
DETALHES DO CONTATO
Myreal Energy Saving (Shanghai) Co., Ltd.

Pessoa de contato: Mrs. Betsy Ouyang

Telefone: +86 177 4080 0950

Envie-nos seu inquérito diretamente
(0/3000)

O que eles disseram
We feel very happy during the cooperation with Guangzhou CJC Seals Technology Co.,Ltd.. The company has strong strength, good reputation and high cost performance. They have an excellent professional technical team and can complete the project in time and with quality; They respect our needs and abide by the ethics of taking jobs.

—— Alebel Tadele

Estou a conversar online agora.