Hotel Ductwork Insulation Case: The Shanghai JW Marriott Marquis Hotel Project

2026-11-13 11:03:39
Latest company case about Hotel Ductwork Insulation Case: The Shanghai JW Marriott Marquis Hotel Project

Hotel Ductwork Insulation Case: The Shanghai JW Marriott Marquis Hotel Project

A high-rise hotel runs its air systems continuously: supply, return and fresh air serving guest floors, banquet space, kitchens and back-of-house. The ductwork runs through shafts and above ceilings for the full height of the building, and the same duct has to hold a temperature difference and stay quiet doing it.

Centrifugal glass wool is the material that does both. It is light, so it adds little load to duct supports over a long riser; it is non-combustible mineral wool, which suits a duct passing through compartments; and its fibrous structure attenuates air noise, which matters in guest floors where the system is the dominant background sound. A foil facing completes the system, giving the vapour resistance and the mechanical protection the duct needs above a ceiling.

On the Shanghai JW Marriott Marquis hotel project the scope covers the air-handling ductwork serving the guest floors and public areas, supplied as centrifugal glass wool with a foil facing and installed through the vertical shafts and ceiling voids.


FAQ

Why glass wool rather than a closed-cell foam for hotel ducts? Because ductwork usually needs acoustic performance as well as thermal. Glass wool attenuates air noise and is non-combustible, so one product meets both duties; a closed-cell foam is the better choice on cold pipework, not on air ducts.

What does the foil facing do? It provides the vapour resistance and the mechanical protection for the fibrous core, and it keeps the duct surface cleanable. Above a ceiling the facing also determines how the insulation behaves if a leak or a cleaning operation wets it.

Does duct insulation have to be replaced when the system changes? Only where the duct is modified. On a long riser the value of the installation is continuity: joints taped and sealed, no gaps at hangers, and the facing intact. Those details decide performance more than the nominal thickness.


Related ranges and next step

Prepared by Myreal Energy Saving (Shanghai) Co., Ltd. Project name, location and supplied material follow the project contract record; final selection for a new project follows its own specification and the declared product data.

Contact Details
Myreal Energy Saving (Shanghai) Co., Ltd.

Contact Person: Mrs. Betsy Ouyang

Tel: +86 177 4080 0950

Send your inquiry directly to us
(0/3000)

I'm Online Chat Now
What Did They Say?
We feel very happy during the cooperation with Guangzhou CJC Seals Technology Co.,Ltd.. The company has strong strength, good reputation and high cost performance. They have an excellent professional technical team and can complete the project in time and with quality; They respect our needs and abide by the ethics of taking jobs.

—— Alebel Tadele